Kalanga Gad Hydro Electric Project, a monumental endeavor nestled amidst the tranquil landscapes of Sunkuda and Khiratadi VDCs in Nepal’s Bajhang district.

Salient Feature:

The brief salient features of the project as described in the PPA documents are;

  1. Project Name: Kalanga Gad Hydro Electric Project (KGHEP)
  2. Project Area: Kedarsyu Rural Municipality, Bajhang
  3. Source: Kalanga gad khola
  4. Project Type: RoR
  5. Project Capacity: 15.33 MW
  6. Catchment area at HW: 446.71 Sq. km
  7. Design Discharge: 20.70m3/sec
  8. Gross Head: 136.50 m
  9. Weir: Length – 42m , Height – 4m
  10. Desanding Basin: Length – 110m
  11. Penstock: 326 meter, diameter 1.55 m and thickness of 22 mm
  12. Powerhouse: The powerhouse is of surface type and size 35m x 26m x 20m
  13. Turbine: Vertical Axis Francis 2 unit
  14. Generating Units: Two units of 3 phase synchronous Generator of 50 Hz of Frequency and Generation Voltage of 11 KV.
  15. Head Race Tunnel: 3770.80m of 3.1m dia of inverted D-shape
  16. PPA and Energy: Total annual contract energy of 97.962 GWb, 76.696 GWh wet and 21.266 GWb dry
  17. Project Cost NRs 4,339 million
  18. Commercial Operation Date: Magh 27, 2079